Renovation bill of quantities: how to start from the floor plan

A bill of quantities lists the works of a renovation with their quantities; the priced version adds the prices and reaches a total. Most of the quantities are already in the floor plan. This guide explains which ones they are, how to get them without copying them by hand and what is left for the professional to do.

A bright building site with walls marked in cyan light

Updated on 25 October 2026 · Loto Studios

Measured and priced: two steps of the same document

The bill of quantities lists each item of work with its unit and its quantity: square metres of floor to lay, metres of partition to demolish, number of doors to replace. The priced bill of quantities multiplies each quantity by a unit price taken from a price list, and adds up the items.

The first step is measurement, the second is valuation. If the measurements are wrong, no price list fixes the total: that is why it pays to start from a reliable floor plan.

The typical items of a renovation, and where they are measured

ItemUnitMeasured onFrom the floor plan?
Demolition of partitionsm or m²Length of the walls to remove × heightYes
New partitionsm or m²Length of the new walls × heightYes
Screeds and floorsm²Net floor area of each roomYes
Skirting boardsmPerimeter of each room minus doorsYes
Plaster and paintingm²Net wall surface (openings subtracted)Yes
Doors and windowsnumberOpenings placed on the wallsYes
Systems (electrical, plumbing)points or lump sumProject of the systemsNo: they need their own project

Six items out of seven come from the geometry of the plan. Systems, special finishes and site costs are added by the professional.

Getting the quantities from a model

There are three ways to measure, the same as for square metres: by hand with the dimensions, by drawing polygons in a CAD, or with a model that measures every room. With a model, quantities do not have to be copied: they come from the walls and rooms of the model.

In ShotPlan you start from the plan as DXF, PDF or photo: walls, doors and windows are recognised and rooms are generated from closed walls. The model calculates floor area and perimeter per room, gross and net wall surfaces, the length of the internal walls and the openings, and exports them as JSON. For floors it also calculates tiles and planks with pieces, boxes and waste, and gives the commercial floor area (DPR 138/98) with the number of rooms. From there they reach your estimating program or a spreadsheet.

The quantities of the demo flat

These are the quantities that the demo project “Appartamento tipo” (69.30 m²) gives without any manual measurement:

QuantityValueTypical item
Floor area (on the wall axes), 5 rooms69.30 m²Screeds, floors
Living and kitchen32.03 m²Floor
Bedroom 1 · bedroom 214.58 m² · 10.62 m²Floor
Hall · bathroom6.79 m² · 5.29 m²Floor, tiles
Internal partitions17.50 mPartitions to build or demolish
Net walls153.88 m²Plaster, painting
Openings8 (5 external, 3 internal)Windows, doors

To turn them into costs you apply a price list: the quantities and costs guide shows a worked example on the same flat. ShotPlan gives you the quantities per room; you apply the price list in your sheet or your estimating program.

What the model does not do

  • It does not apply measurement rules: deductions for small openings, waste, “empty for full” conventions are applied by whoever draws up the bill of quantities.
  • It does not measure systems and lump-sum items: they need their own project.
  • It does not sign: when the bill of quantities is needed for permits, tax deductions or a tender, it is drawn up and signed by a qualified professional.

What it does: it gives the professional verified quantities in minutes instead of hours, and updates them when a wall changes.

Frequently asked questions

What is the difference between a bill of quantities and a priced one?

The bill of quantities contains the quantity of each item of work; the priced one adds unit prices and the total. The second is built on the first: if the quantities are right, changing price list is just a recalculation.

Who can draw up the bill of quantities of a renovation?

For an idea of costs, a contractor can prepare it too. When it is needed for building permits, tax deductions or tenders, it is drawn up and signed by a qualified professional: surveyor, architect or engineer.

Does ShotPlan produce the priced bill of quantities?

ShotPlan gives the quantities measured by the model, in the square-metre PDF report and in the JSON export. The bill of quantities itself, with measurement rules and signature, remains with the professional, who starts from numbers that are already verified.

Can I start from a PDF floor plan?

Yes. In ShotPlan you upload the PDF: walls, doors and windows are recognised and you confirm the scale with one real measurement; whatever is missing is completed by hand in “Technical” mode.